RSS

FJ Auto-jumble

18 Feb

Hoping to bolt a few bits of the FJ together soon.

I lifted the motor down off the table and set it on wooden blocks roughly at it’s finished height —

FJ 005

It will be a matter of checking through my auto-jumble of bits for things like –

the airbox and carb rubbers which are still at the cleaning stage —

FJ 001

the carb heat shield which is hanging up to dry after de-greasing. A tidy up with my rubber mallet should see her shipshape again —

FJ 003

I found the lower frame rails looking sad but when I’m happy with their condition I will give ’em a coat of paint ready to bolt into place —

FJ 002

after I wrap the main frame around the motor.

FJ 004

The carbs didn’t appear to be all that great with what looked like thirty years muck on them but I’ve made a start on the cleaning process and I think they will come up ok —

FJ 006

Just to have something shiny to play with amongst all the muck I bought myself a treat off ebay.

A nice set of soft jaws for my vice. Invaluable when it comes to holding parts that are easily marked – firmly —

FJ 008

No doubt I will find other bits on the shelf that should be fitted before marrying the frame to the motor – but –

Rome wasn’t built in a day 🙂

 
Comments Off on FJ Auto-jumble

Posted by on February 18, 2015 in Yamaha FJ1100

 

Tags:

Comments are closed.

 
%d bloggers like this: