RSS

FJ 1100 – Rebuild Starts Here

03 Mar

Winter will soon be over so I had better make a start to putting the FJ back together. With the heavy lump of a motor already sitting on wooden blocks mating the frame to the motor wasn’t too difficult.

Simply a case of laying the main frame over the top —

fj rebuild 001

Lining up the bottom rails —

fj rebuild 002

offering up the side plates —

fj rebuild 015

and sticking a few bolts in.

fj rebuild 003

Before bolting the inlet rubbers in place and hanging the carbs on 🙂

 

 

 
Leave a comment

Posted by on March 3, 2015 in Yamaha FJ1100

 

Tags:

leave a reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

 
%d bloggers like this: